Friday 6 October 2017

To prepare R.C.C Column

 To Prepare R.C.C Column 

Date:-10 Sept 2017

Aim:- To Prepare R.C.C Column.

Requirement:-Tools and equipment measuring tape, thapi, khore, gunny bags,etc

Materials:-8mm torshan bar, 6 mm bar, sand, gravels, cement, water, etc

Procedure:- 1) Take torshan bar 8 mm and 6 mm bar make frame and ring
                              2) Mix cement, gravels, sand, prepare concrete
                    3)Take molde and fix torshan bar and fill with concrete
                    4) use G.I wire to roped it a molde
 Costing of materials:-
Sr.no
MATERIALS
QTY
RATE
AMOUNT
1
SAND
4 TOPLI
15 PER
60
2
GRAVELS
2 TOPLI
12 PER
24
3
CEMENT
2 TOPLI
8 PER
112
4
TORSHAN BAR 8 MM
1.931kg
48 KG
92.68
5
TORSHAN BAR 6 MM
0.222kg
48 KG
92.68



WORKING CHARGE 25%
95.34



TOTAL
476.70

images:-

No comments:

Post a Comment